Level IT Top – Heavy Duty, Abrasive Resistant Surface Finish
- Foot traffic in as little as 2 hours
- Ready to receive forklift traffic after 36 hours
- Ready to receive resin finishes after 24 hours
- Pump or trowel applied
- 30 to 40 mins working time
- 5 to 15mm depth
*Will need to be ordered in*